Production
Shop Floor
Travelers, operator clocking, WIP movement, scrap, rework, and operation signoff.
Active travelers
14
4 running, 3 setup, 5 waiting
Labor captured
126h
Current week posted to jobs
WIP holds
2
MRB or QMS disposition
TRV-2234
SetupWO-2234 / VBK-22 Rev C / Qty 25
Operator
M. Torres
Machine
VMC-1
Operation
Op 10 Setup
Next Gate
FAI request
Progress18%
TRV-2233
RunningWO-2233 / TFX-9 Rev A / Qty 12
Operator
L. Chen
Machine
Lathe-2
Operation
Op 20 Turn OD
Next Gate
In-process check 2
Progress54%
TRV-2232
InspectionWO-2232 / BA-44 Rev B / Qty 40
Operator
QMS
Machine
Inspection
Operation
Op 80 Final
Next Gate
CoC release
Progress88%
TRV-2231
HoldWO-2231 / DH-19 Rev D / Qty 8
Operator
MRB
Machine
Hold Cage
Operation
Disposition
Next Gate
NCR-114
Progress63%